Map Recent Data Charts Control Radar Alarms Notes Maintenance Contact

To carry out maintenance, use the Android app.

This page is for reading and downloading what has already been recorded. The visit itself is done on a phone at the site, offline, and uploaded on the trip or afterwards (depending on cell service).

Download the app

‹ all sites

Ray Cres 2

2026-09-14 18:19

Group
CoG
Site
Ray Cres 2
Data file
Ray_Cres_2.csv
Started
2026-09-14 18:19:20
Ended
2026-09-14 18:21:22
Times
phone local time UTC-04:00
Rows
14

Photographs (1)

Ray_Cres_2_20260914_wide_181944.jpg
Ray_Cres_2_20260914_wide_181944.jpg

The record

TimeEventItemValueUnit PointStandardNote
18:19:20 visit started Ray Cres 2 CoG
18:19:20 method chosen Radar — depth distance
18:19:20 batteries changed battery pack changed
18:19:31 site check Radar — no rainfall ok
18:19:35 site check Access — safe and stable ok
18:19:38 site check No damage in work area ok
18:19:44 photograph, wide photos/Ray_Cres_2_20260914_wide_181944.jpg 43.5293 -80.2272 gps
18:20:19 depth-radar step Distance mount face to water surface 5000 mm 1 5000
18:20:40 depth-radar step Radar angle from horizontal 3.6 ° 1 5000
18:20:46 depth-radar step Sensor-reported distance at that moment 43.06 mm 1 5000
18:20:49 depth-radar step Mount and bracket secure done 1 5000
18:20:50 taken out of order radar left unfinished skipped the close-up before you touch it
18:21:20 taken out of order ending the visit skipped Radar — depth is not finished; the final check has not been run; closing close-ups for 1 probe; the closing wide shot
18:21:22 visit ended Ray Cres 2