Map Recent Data Charts Control Radar Alarms Notes Maintenance Contact

To carry out maintenance, use the Android app.

This page is for reading and downloading what has already been recorded. The visit itself is done on a phone at the site, offline, and uploaded on the trip or afterwards (depending on cell service).

Download the app

‹ all sites

Bould Cres

2026-09-06 10:25

Group
CoG
Site
Bould Cres
Data file
Bould_Cres.csv
Started
2026-09-06 10:25:32
Ended
2026-09-06 10:27:16
Times
phone local time UTC-04:00
Rows
28

Photographs (3)

Bould_Cres_20260906_1025_dtec_102607.jpg
Bould_Cres_20260906_1025_dtec_102607.jpg
Bould_Cres_20260906_1025_radar_102654.jpg
Bould_Cres_20260906_1025_radar_102654.jpg
Bould_Cres_20260906_1025_wide_102538.jpg
Bould_Cres_20260906_1025_wide_102538.jpg

The record

TimeEventItemValueUnit PointStandardNote
10:25:32 visit started Bould Cres CoG
10:25:32 method chosen DTEC — EC clean
10:25:32 job added by hand DTEC — EC not in this site's data
10:25:32 method chosen Radar — depth distance
10:25:32 method chosen Radar — velocity spot
10:25:32 method chosen Battery maintenance swap
10:25:33 site check Radar — no rainfall ok
10:25:34 site check Access — safe and stable ok
10:25:34 site check No damage in work area ok
10:25:38 photograph, wide photos/Bould_Cres_20260906_1025_wide_102538.jpg 43.5366 -80.2553 gps
10:26:07 photograph, sensor photos/Bould_Cres_20260906_1025_dtec_102607.jpg no gps
10:26:10 dtec probe Manual depth before removal invert to water surface 22 mm 1 22 before the clean
10:26:28 dtec probe Probe lifted out of the water done
10:26:30 ec step Cell rinsed with DI water done
10:26:31 ec step Electrodes wiped done
10:26:31 dtec probe Probe returned to the water at the same height done
10:26:34 dtec probe Manual depth after replacing invert to water surface 22 mm 1 22 after the clean
10:26:54 photograph, sensor photos/Bould_Cres_20260906_1025_radar_102654.jpg no gps
10:26:56 depth-radar step Distance mount face to water surface 2500 mm 1 2500
10:26:58 depth-radar step Radar angle from horizontal 55 ° 1 2500
10:27:01 depth-radar step Sensor-reported distance at that moment 2555 mm 1 2500
10:27:03 depth-radar step Mount and bracket secure done 1 2500
10:27:05 velocity step Manual surface velocity 22 mm/s 1 22
10:27:07 velocity step Sensor velocity at that moment 022 mm/s 1 22
10:27:10 battery step Batteries changed done
10:27:10 batteries changed battery pack changed
10:27:15 taken out of order ending the visit skipped the final check has not been run; closing close-ups for 2 probes; the closing wide shot
10:27:16 visit ended Bould Cres